BUILDING MATERIAL CATEGORY

Doors & Windows

Door and window quotations depend on more than width and height. Define opening dimensions, frame system, glazing, hardware, finish and project performance requirements before production.

Doors & Windows

PROJECT FIT & APPLICATION

Coordinated around architectural drawings and job-site requirements.

Share your room schedules, floor plans, or BOQ before quotation. Providing context early prevents mismatched specifications, ensures accurate hardware tolerances, and speeds up the quotation timeline.

Send Drawings for Review

TARGET APPLICATIONS

Common Project Fit

  • Residential projects
  • Hotels and resorts
  • Apartment buildings
  • Commercial fit-outs

SUPPLY CAPABILITIES

Coordination Scope

  • Interior and exterior doors
  • Window systems
  • Frame/finish options
  • Glass and hardware coordination
  • Drawing-based sizes

MANUFACTURING & SPECIFICATION GUIDE

Procurement Parameters & Standards

Verified supply parameters for Doors & Windows based on George Group's Foshan manufacturing operations and audited partner network.

Customization ScopeCustom dimensions, CAD shop drawings, finish selection, material composition, and hardware configuration according to architectural drawings.
Quality & Environmental StandardsE1 emission classification, EN 717-1 formaldehyde testing, CARB standards where applicable, with full SGS inspection and testing support.
MOQ PolicyFlexible and project-based. Low MOQ options available for project packages. Quotation confirmed based on total material scope.
Sample & Mockup PolicyMaterial samples, finish swatches, color references, and door/hardware samples available for physical confirmation prior to mass production.
Quality Inspection (QC)100% pre-shipment inspection covering dimensions, finishes, assembly tolerances, hardware pre-fitting, export crating, and high-res client reports.
Warranty CoverageStandard product warranties typically range from 2 to 5 years depending on product category, material specification, and contract terms.
Quotation TurnaroundInitial quotation and material schedule normally provided within 24 hours after receiving sufficient drawings, BOQ, or room dimensions.

BEFORE QUOTATION

Checklist: Details to confirm before production.

Missing specifications create unnecessary revisions or job-site installation delays. Use this category checklist when submitting your inquiry.

  • Rough opening / finished opening
  • Opening direction
  • Frame profile
  • Glass configuration
  • Hardware
  • Finish
  • Local performance/code requirements

START WITH YOUR PROJECT SCOPE

Send drawings, a BOQ or a product list.

We can structure the material scope and identify the specifications needed for a useful quotation.

Request Project Quote